Since we live in the only city in the nation where real estate prices have continuously (even through the recession) and are still, going up, Adrian and I had to be creative in order to make having a home a reality. Our experience was that any house that was within our price range had so many people also interested in it that there was no way we could compete! And ALL were in terrible shape, aka a fixer-upper. Let me explain. The irony is that fixer-uppers, appealing to many a person not having lots of cash for fancier homes, is now, post housing crisis, nearly impossible for financing unless one is able to plunk down a 20% downpayment-hmmm. So here, this means that for fixer uppers with a low(er) price tag, the average person is competing with flippers who are apt to pay straight cash. In a moment of frustration, I set the search criteria to anything that had been on the market for more than a month (unheard of in DC!) and lo and behold, what became our house popped up in the very neighborhood where we were renting at the time and also close to several of our good friends! I must say that Adrian trusted me that we could make something out of this "house", and he just kept saying, "I'm with you babe, I trust you" and I think he was also trying to convince himself if he said it enough!
Our plan became to gut and renovate the first floor and partially gut the second floor in this first phase of construction. We hired a contractor to do the "hard" stuff and my dear husband was going to do the rest ("I'm with you babe"). Adrian didn't know how to do most things construction, and I think he was scared of my expectations for the things that he had done before (drywall). I hope he will say that I haven't been too unreasonable!
The contractor was hired to do the demolition, facilitate moving the gas and electric meters outside, install some steel beams where we wanted to remove load-bearing walls, and install all new plumbing and electric. The plan was for us (mostly Adrian) to insulate the crawlspace, frame and insulate walls, hang and mud the drywall, refinish the ceiling (I'll explain later), stain and install all new trim and baseboards, and refinish the floors.
So, the big picture of the plan for this house is to add a new third floor. The current roof is a true flat roof which of course means that it is prone to water problems. Nothing is leaking so far, but who knows when my luck will run out on that one. The second phase of construction will be to add the third floor but leave it unfinished interior space and to simultaneously gut and renovate the second floor. The last phase will be to finish out the third floor. If I want to make the historic board happy, I will propose taking the house from this:
To this:
Not terribly exciting but we'll paint the brick and be on our way to looking like a proper house. What I really want to do is more modern but I am still working on the design and will post that later!
I have to give a shout out to Adrian's parents who agreed to let their beyond fledgeling son (and wife) come home for a few months and who without them, this never would have been possible for us!! Thanks Aat and Nina!
fledgeling son, wife,.....and Seuss.
ReplyDeleteQuite a project guys. I honestly wish I was closer so I could help out!
The one thing Ash and I have found out is that a HOUSE is never truly "finished" no matter how many things you cross off of your list, but it is HOME from day one.